Concrete, Cabinets, Floors and Finish Carpentry
![](https://clintonhabitat.org/wp-content/uploads/2023/08/IMG_7277-rotated.jpg)
The walkways are poured, cabinets are up and the floors are laid.
The finish work including molding, electrical, fixtures and patching are underway.
![](https://clintonhabitat.org/wp-content/uploads/2023/08/Concrete-0824-rotated.jpg)
![](https://clintonhabitat.org/wp-content/uploads/2023/08/IMG_3210-rotated.jpg)
![](https://clintonhabitat.org/wp-content/uploads/2023/08/IMG_3208-rotated.jpg)
The walkways are poured, cabinets are up and the floors are laid.
The finish work including molding, electrical, fixtures and patching are underway.